Indicative pre-screening only. A size match is not a docking approval. The depth test uses the vessel’s deeper arrival draft plus the approved clearance and checks it against each dock’s approved depth over keel blocks at safe submergence. Final allocation requires Namdock engineering review of the docking plan, trim, hydrostatics, stability, ballast sequence, block loading, weight distribution, site water level and operating conditions.